A strong wafer standard can be destroyed by weak handling.
Packaging, clean handling, storage environment and inspection records preserve the value of the deposited standard.
Receiving inspection
Verify package integrity, wafer identifier, certificate, lot, requested configuration and any shipping indicator before opening.
Controlled handling
Use the approved clean handling method, compatible wafer tools and defined orientation. Avoid touching the surface or exposing the wafer to uncontrolled environments.
Storage
Follow the supplier’s temperature, humidity, orientation and container requirements. Store the certificate and use history with the wafer identity.
Requalification and retirement
Define when the wafer will be re-inspected, cleaned if permitted, requalified or retired. Drift, added contamination and handling damage can invalidate the standard.
Need help matching equipment to the study?
Applied Physics can review the airflow area, test objective, desired visibility, operating duration and deployment constraints.
Talk with Applied Physics